Short answer

Parapet wall repair usually starts at the top of the wall. Most parapet leaks come through the coping: open joints, screws driven through the top, a coping that slopes toward the outside, or no membrane under the metal. Others come through the base flashing, cracked mortar or loose stone copings. The lasting fix is membrane carried over the top of the wall, a coping sloped toward the roof and held by hidden clips, and repointed masonry where the wall itself is wet.

What are parapets and copings on a flat roof?

A parapet is the part of an outside wall that rises above the roof. The coping, also called a cap flashing or coping cap, is the cover on top of it: usually bent sheet metal on commercial roofs, sometimes precast concrete or stone. A parapet looks like one wall, but it is a stack of parts, and each one fails in its own way.

The parts of a parapet on a flat roof. Sources: RCABC Roofing Practices Manual, Part 13 and SBS Parapet detail; IKO Commercial Roofing Guide (2024); Building Code, January 16, 2025 edition.
PartWhat it doesWhat usually goes wrong
The wallMasonry, concrete, or steel or wood studs with sheathingCracked mortar, spalled brick, rotted sheathing, a wall that leans or bows
Base flashingMembrane run up the roof side of the wallSplits, open laps, flashing left too low after new insulation
Membrane over the topThe waterproofing under the copingMissing on older roofs, so the coping is the only barrier
Wood blocking (nailers)Gives the coping a solid, sloped base to fasten toRot once water gets under the coping, then loose metal
CopingSheds water off the top and covers the membrane edgesOpen joints, loose clips, wrong slope, screws through the top
CounterflashingMetal over the top edge of the base flashing on taller wallsLoose or bent metal, dried-out sealant

The flashing on the roof side of the wall is covered in our roof flashing repair guide. This guide covers the rest: the top of the wall, the coping, the wall itself and the work around them.

Why do parapet walls leak?

Because a parapet is exposed on three sides. NRC's Canadian Building Digest 69 says parapets are "exposed to extremes of weathering on both sides and top", and adds that "many apparent roof leaks can be traced to faulty wall flashings." Water under a parapet can come from the coping, the flashing, the wall or the roof, so the first job is to find which; our leak detection guide covers how roofers trace it.

Where parapets let water in. Sources: NRC Canadian Building Digest 69 (1965); RCABC Roofing Practices Manual, Part 13; L. Cook and M. Novesky, RCI Symposium (November 2013, U.S.); Building Code, January 16, 2025 edition, 4.1.6.
What you see insideWhere to lookLikely cause
Drips at the top of an outside wall in wind-driven rainCoping joints and the top of the copingOpen or caulk-only joints, screws through the top, no membrane under the metal
Stains where the roof meets the wallBase flashing on the roof sideSplits, open laps, flashing too low after new insulation
Wet patches lower on the wall, often at window headsMasonry, mortar joints and the flashings inside the wallCracked mortar, missing flashing under jointed copings, faulty wall flashing
Water during snowmelt, not rainThe roof side of the parapet and its cornersSnow drifts against parapets (the Building Code designs for them), holding meltwater against the flashing
Leaks at one spot along the edgeScuppers and anything fastened through the parapetFailed flashing at the opening; see our drainage guide

Some of the water in a parapet never came from outside. An NRC digest on humidified buildings says "some parapet failures are the result of the deposition of water from moist air leaking outward and upward through the wall below into the parapet", and lists "disruption of parapets" among the effects. In an Ontario winter, warm, moist air from the top floor rises into the cold parapet, condenses and freezes, then melts on the first mild day, which looks like a roof leak on a dry day. That kind of water is stopped by sealing the air path into the parapet from inside, not by more roofing on top.

How is parapet wall repair done at the coping?

By treating the coping as a cover, not as the waterproofing. The Roofing Contractors Association of British Columbia (RCABC), whose Roofing Practices Manual is the most detailed Canadian standard for roofing sheet metal, puts it plainly: "Linear metal flashings are not a waterproofing component. Consequently, the roofing membrane should be continuous beneath the metal." IKO says the same for modified bitumen: "At parapets, the base sheet must be installed up and over the parapet and nailed on the outer parapet wall." With the membrane in place, the RCABC standard builds the coping like this:

  • Slope toward the roof. A wall top wider than 100 mm is sloped "at least 2% toward the roof. Drainage toward the exterior of a building is not recommended." The slope is built into the wood blocking, and the coping must be "fully supported" on it.
  • No screws through the top. "Fastening the top (horizontal or sloped) surface of a flashing with exposed fasteners is not permitted." The outside face hooks onto a hidden metal clip (a cleat); the roof side may take gasketed screws.
  • Proper seams. Joints are "fully seamed using only an S-lock" or a standing seam, which leave the metal room to expand and contract. Butt joints with a backing plate and sealant are allowed only on heavier metal.
  • Drips and metal. A drip kicked out at least 12 mm is "strongly recommended" so water falls clear of the wall. Prefinished steel copings are 26 or 24 gauge, and RCABC's 15-year guarantee takes only 24 gauge or heavier.

The right repair depends on what failed:

Parapet and coping repairs, from small to large. Sources: NRC Canadian Building Digest 69 (1965); RCABC Roofing Practices Manual, Part 13; R. Capolino, Interface (April 2012, U.S.).
RepairWhen it fitsPoints to watch
Reseal coping jointsA few open joints on sound metal, as a stopgapNRC: "Caulking compound cannot be depended on to keep joints watertight, because hardening and movement soon crack it open"
Re-secure the copingLoose or lifted metal on sound blockingNew clips on the outside face; metal with screw holes through the top is better replaced
New coping over new membraneRust, many open joints, a coping that slopes outward, no membrane under the metalMembrane over the top first; new blocking where it is wet or rotted; new metal, not the old pieces
Re-flash the wallSplit, loose or too-low base flashingCovered in our flashing repair guide
Metal cap over stone copingsStone or precast copings with leaking jointsA U.S. roof consultant warns: "Simply installing metal copings over actively leaking coping stones often results in leaks within five or ten years"
Rebuild the top of the wallCracked, bowed or loose masonry, or rotted framingNeeds a design, often a permit, and a mason

The common mistakes are the ones the standards forbid: screws through the top of the coping, metal that slopes toward the outside, sealant used as the only seal, and new metal fastened into wet blocking.

Why do copings matter so much in high winds?

Because the coping holds down the roof edge, where wind suction is strongest. Ontario's Building Code designs the top and roof side of a parapet for the same pressures as "the cladding of a roof surface at the level of the top of the parapet" (4.1.7.5.(9)). National Research Council (NRC) researchers, citing field data from major U.S. hurricanes, wrote that "the majority of the roof failures were due to the failure of metal roof edges". Once a coping lifts, wind gets under the membrane, which is why our storm damage guide starts every inspection at the edge metal.

Ontario's Building Code requires a wind uplift test for the membrane roof assembly (CSA A123.21, 5.2.2.2.(4)) but names none for copings. The U.S. code requires edge metal to pass ANSI/SPRI/FM 4435/ES-1, whose RE-3 test pulls up and out on a coping at once, and NRC researchers who measured roof edges at a Canada Post plant in Vancouver wrote in 2017 of a "lack of wind load criteria for proper roof edge design process in the Canadian building code". Here, a wind-tested coping is a choice made in the specification. Two points apply to any coping:

  • The blocking holds the coping. SPRI, the U.S. single-ply roofing association, says "For the edge metal to perform as tested the nailer must be properly secured."
  • Do not hang things on the coping. Lightning protection, signs or cables fastened to edge metal can increase the wind load, create "a leak point" and stop the metal from moving, according to SPRI.

Is the leak in the roof or in the masonry wall?

On brick, block and stone parapets, it is often the wall. NRC's digest on rain penetration says "Parapet walls are frequently a source of entry of rain when they have not been isolated from the wall below by proper flashings." Ontario's Building Code reflects this for smaller buildings: masonry walls get flashing "over the back and top of parapet walls" (9.20.13.3), and under any coping made of jointed masonry units (9.20.13.4). Signs that the wall, not the roof, is the problem:

  • White salt on the outside face. Efflorescence is left when water moves through masonry and dries at the surface, and NRC notes the salt crystals can cause "actual damage to masonry". It means the wall is wet, not just stained.
  • Open mortar joints, spalled brick or loose coping stones. Joints on top of a wall fail first: a U.S. consultant writes that a mortar joint there "rarely has a weathertight life expectancy of more than a few years" and should be relied on only where metal flashing sits under the top course.
  • A wall that leans, bows or cracks at the roof line. NRC says "There is an even greater tendency for movement to take place in parapet walls than in the main walls of a building".
  • A water test that brings the leak back only when the wall is sprayed, not the roof.

So parapet wall repair is often split: a mason repoints and rebuilds, a roofer handles the membrane and metal copings, and an engineer looks at walls that lean or have cracked through. In winter, mortar and masonry must be kept at 5°C or more for 48 hours (9.20.14.1).

What happens to parapets when the roof is replaced?

They get lower, in effect, because new insulation raises the roof surface. A wall that stood 300 mm above the old roof may stand 150 mm above the new one, while the membrane flashing still has to reach about 200 mm up the wall, as our flashing guide explains. So at a re-roof:

  • Carry the membrane over the top. RCABC treats parapets up to 609.6 mm (24 in) high as "standard" and carries the base membrane "in one piece over the top and down the exterior face".
  • Raise the wall or the blocking where the parapet is too low for the flashing or the coping slope. IKO adds that "Where perimeter insulation thickness is greater than 3 inches (75 mm), the base sheet must terminate on the parapet wall."
  • Replace the coping. Bent-off metal rarely goes back on well, and RCABC's guarantee program forbids reusing it.
  • Check the drains. The Building Code's roof drain article calls for overflows or scuppers and at least two drains where a parapet is more than 150 mm high or higher than the wall flashing (7.4.10.4.(4)); ask the designer how it applies to your roof, and see our drainage guide.

Our roof replacement guide walks through the rest of the process.

What do Ontario's codes require for parapets?

Most parapet rules sit in the Building Code, and Part 11, which covers existing buildings, asks that a repaired system perform at least as well as it did before the work (11.3.1.1). These are the clauses an owner is most likely to meet:

Ontario rules on parapets and copings. Sources: Building Code, January 16, 2025 edition (Part 9 applies to smaller buildings; larger buildings are designed under Parts 4 and 5); Building Code Act, 1992.
ClauseWhat it says
Water at junctions (5.6.2.2.(4))Junctions between walls and roofs "shall be designed and constructed to minimize the flow of water from the sloped or horizontal assembly onto the vertical assembly"
Wind on parapets (4.1.7.5.(7) to (9))The top and inner faces of a parapet are designed for the roof cladding pressures at the parapet's top; parapets are also designed as structures in their own right
Earthquake (4.1.8.18)"Cantilever parapet and other cantilever walls" get an amplification factor of 2.5, the same as ornaments and appendages, and their connections must be designed for it
Masonry parapet size (9.20.6.5)Height above the roof "not more than 3 times the parapet wall thickness"; solid masonry from the top to at least 300 mm below the roof; hollow units filled
Unfinished masonry (9.20.14.2)The top of masonry left exposed "shall be completely covered with a waterproofing material when construction is not in progress"
Signs on parapets (Division C, 1.2.1.2.(7))A projecting sign attached to a parapet wall must be designed by an architect or professional engineer
Firewall parapets (3.1.10.4)A firewall rising through the roof must usually continue as a parapet; see our plaza roofing guide for the heights
Building permits (Building Code Act, ss. 1 and 8)A permit is needed to "construct", which includes "material alteration or repair", and Division C lists no exemption for roof or parapet work; ask the building department before rebuilding, raising or removing a parapet

The Building Code gives no coping slope, metal gauge or clip spacing for commercial roofs. Those come from roofing standards and the roof maker's details, so a parapet repair specification should name both.

What safety rules apply to parapet repairs?

Treat the parapet as an edge, not as a railing. Ontario's construction regulation, O. Reg. 213/91, never uses the word "parapet". It requires a guardrail, or the next-best method, where a worker could fall more than 3 metres (ss. 26 and 26.1), and a guardrail's top rail must sit 0.9 to 1.1 metres high and resist a 675 newton sideways load (s. 26.3). A low parapet, or one with its coping taken off for repair, does not meet that. The photo at the top of this page shows the usual answer: guardrails clamped along the parapets.

The risk is real. In August 2022, an electrician running wire on a two-storey commercial building in Hamilton suffered a fatal fall from the roof, which "had a parapet wall along its perimeter with no temporary fencing or guarding at the roof's edge"; the stairwell to the roof was unlocked and there were no warning signs. Two companies were fined a total of $230,000, as reported in January 2025.

Ontario rules for work at a parapet. Sources: O. Reg. 213/91 (Construction Projects), consolidation from April 20, 2026; R.R.O. 1990, Reg. 851 (Industrial Establishments), consolidation from July 1, 2022.
SituationThe rule
Working at the roof edgeGuardrail first; if that is not practicable, travel restraint, fall restricting, fall arrest or a net, in that order, with written rescue procedures for fall arrest (s. 26.1)
Built-up roof workA barrier at least 2 metres from the roof perimeter in the work area, such as weighted posts with a taut rope 1.1 metres high (s. 207)
A sidewalk or public walkway belowNo work on a building 4.5 metres or less from a public way without a covered way over it, unless the work is enclosed (s. 64); a fence at least 1.8 metres high where the public may be endangered (s. 65)
Debris and old coping metal"Rubbish, debris and other materials shall not be permitted to fall freely from one level to another" (s. 35(2)); lower it by chute, container or hoist
Taking down masonryRemove masonry walls "in reasonably level courses" (s. 218); no worker stands on top of a wall unless staging is no more than 2.4 metres below (s. 219); brace a wall that may collapse (s. 212)
The owner's own staff on the roofA maintenance-only roof needs no guardrail, but the employer must "develop and implement other measures and procedures to protect workers from the hazard of falling" (Reg. 851, s. 13(3))

A "public way" includes any open space "to which the public has access", so a plaza walkway can count. Scaffolding, a hoist or a bin on city property also needs a municipal permit: a Street Occupation Permit in Toronto, a Road Occupancy Permit in Mississauga. And the owner's duty starts before any repair: Toronto's property standards by-law requires exterior walls to be kept "free from loose or unsecured objects and materials" (s. 629-18), which covers a loose coping or loose bricks. Window-cleaning anchors on parapets have their own rules, covered in our office building roof repair guide.

Do roof warranties cover parapets and copings?

Often not, and leaks through the wall almost never. Roof makers warrant their membrane and flashings; the coping metal, the masonry and the wall are usually someone else's. Read your own warranty, but expect wording like this:

  • Leaks through the wall are excluded. A GAF sample roof guarantee (U.S.) excludes "infiltration of moisture through or around the walls, copings, building structure, or surrounding materials".
  • Metal from other suppliers may not be covered. Carlisle (U.S.) says metal from "a discretionary provider" is "not covered" under its edge-to-edge warranty. Makers also sell their own coping systems; in Canada, Elevate offers a 20-year, 90 mph warranty program for roofs finished with its wind-tested edge metal.
  • Coping stones belong to the designer. IKO's TPO detail for a wall capped with stone says "COPING STONE ATTACHMENT IS THE RESPONSIBILITY OF THE SPECIFIER" and marks the stone, mortar and metal as "(BY OTHERS)".
  • Old metal does not go back on. Under RCABC's guarantee program, "reuse of any existing linear metal flashings is prohibited and may void the Guarantee."

So before parapet wall repair on a roof under warranty, call the warranty holder and use the maker's approved details. Our roof warranty guide lists other things that can void a warranty, and our plaza roofing guide covers who pays under a lease.

Has OYH Roofing built parapet details like these?

Yes, on new roofs, though we have not published a parapet wall repair project, so this guide relies on the codes, standards and sources below. The photo at the top of this page shows the 7,800 sq ft roof we installed at Gauri Shankar Mandir in Brampton while the base sheet was going down. The photo below shows it finished: a Siplast modified bitumen system with a 20-year Siplast warranty, its cap sheet carried up and over the rounded parapet.

Finished grey modified bitumen roof on a building under construction in Brampton, with the cap sheet carried over the rounded parapet
The finished roof at Gauri Shankar Mandir in Brampton: 7,800 sq ft of Siplast modified bitumen, with the granulated cap sheet carried up the parapets and over their tops. The building's wall cladding was still to come.

OYH Roofing is an Oakville-based industrial, commercial and institutional flat roofing contractor working across the GTA. For parapet wall repair, we can trace the leak, re-flash the wall, carry membrane over the top, coordinate new copings, and plan the work with a roof replacement. See all our completed projects.

Frequently asked questions

What is the metal on top of a parapet wall called?

A coping, also called a coping cap or cap flashing. It covers the top of the wall, sheds water toward the roof and protects the membrane underneath. On commercial roofs it is usually prefinished galvanized steel or aluminum, held by hidden clips on the outside face and joined with S-lock or standing seams so the metal can expand and contract. Masonry walls may have precast concrete or stone copings instead.

How do you seal a parapet wall?

Not with sealant alone. The lasting seal is roof membrane run up the roof side of the wall, over the top and down the outside face, with a sloped coping over it. Masonry parapets also need flashing under jointed copings and sound mortar joints. Sealant on coping joints or cracks only buys time until the membrane, the metal or the masonry is repaired.

Is a parapet wall necessary for a flat roof?

No. Many flat roofs end at edge metal with no parapet. Ontario's Building Code requires a parapet mainly where a firewall rises through the roof, and a guard where the roof is used for more than maintenance. Parapets screen rooftop units and give some protection at the edge, but each one adds flashing and a coping that must be kept watertight.

How can I repair coping stones?

Reset loose stones, rake out and repoint failed mortar joints, and check what is underneath. Ontario's Building Code calls for flashing under jointed masonry copings unless the coping is one impervious, non-jointed piece (9.20.13.4). Many older walls have none, so water in the joints soaks into the wall below. A mason resets the stone; a roofer ties the roof membrane in under it.

Should a parapet coping slope toward the roof?

Yes. The top of the wall should slope toward the roof so water runs onto the membrane instead of down the face of the building. The RCABC standard asks for at least 2% on any wall top wider than 100 mm, more on walls over 300 mm, and calls drainage toward the outside "not recommended". The slope is built into the wood blocking under the metal.

Water on the inside of an outside wall, or coping metal that rattles in the wind?

Send us photos of the stain inside and of the parapet and coping from the roof, with the dates it leaked and the weather on those days, and we will tell you whether it looks like the coping, the flashing or the wall, and what the repair involves.

Call 1-833-775-7663Request an assessment
Karol Rajkowski, Vice President of OYH Roofing

Karol Rajkowski

Vice President · OYH Roofing

Karol Rajkowski is Vice President of OYH Roofing, an Oakville-based ICI flat-roofing contractor whose projects include the 53,000 sq ft roof of an industrial building in Mississauga, the 50,000 sq ft TPO roof at Millomat Stampings and the 52,300 sq ft roof at 777 Niagara St in Welland. Learn more about the OYH team.