OYH Roofing

Short answer

Arena roof repair uses the usual flat and metal roof methods, planned around a sheet of ice. Drips over the ice are often condensation rather than leaks, so test before patching. Long spans make chronic leaks and added weight a question for a structural engineer. Work with the refrigeration operator around relief pipes, budget for any solar panels, and replace the roof while the ice is out. Ontario's CSRIF program can pay for part of a roof repair if approval comes before the work starts.

What makes arena roof repair different?

Arena roof repair is roofing over a sheet of ice in a public building used by children's teams, adult leagues and spectators. Five things set it apart from an ordinary commercial roof:

  • Cold underneath. The ice cools the underside of the roof, so condensation drips over the ice are common and easy to mistake for leaks.
  • Long spans. Building Science Corporation describes the most common arena as "large full-span frames of steel or glulam wood with purlins" carrying the roof. With no columns over the ice, a leak that corrodes or rots that structure is serious.
  • Several roofs in one building. Brockville's Memorial Centre has "three distinct roof sections": flat built-up roofs at the front and back and a pre-engineered metal roof over the rink. Recreation centres add roofs over pools, gyms and halls.
  • Equipment on top. Refrigeration condensers and relief pipes, dehumidifiers and air units, and on many arenas, solar panels.
  • A fixed calendar. Ice time is booked months ahead, so big roof work has to fit the season when the ice is out.

Is the water on the ice a roof leak or condensation?

Often it is condensation, and the fix is different. The ice is the coldest surface in the building, and everything that can "see" it loses heat to it, the roof most of all. Sean O'Brien of Simpson Gumpertz & Heger wrote that this radiant cooling "can reduce surface temperatures by 10°F or higher", and that with enough humidity it causes "water dripping onto the ice surface". Building Science Corporation's digest on ice arenas describes the pattern: "Water drips from the ceiling and the drips are usually most numerous over the ice, where the drips freeze, building up bumps and stalagmites."

Condensation or a roof leak? Signs to check over an arena. Sources: Building Science Corporation, BSD-119 (2006); Building Design + Construction, Moisture design tips for ice rinks (2010); CIMCO Refrigeration (2019); National Research Council, CBD-35 (1962).
CheckPoints to condensationPoints to a roof leak
When it dripsMild, humid days, mostly late spring, early summer and fall; big crowds; after flooding the iceDuring or soon after rain or snowmelt, in any season
Where it dripsMostly over the ice, at purlins, metal fasteners, light fixtures and seams in the ceiling linerAt drains, roof edges, rooftop units and other penetrations, and also over the lobby, dressing rooms or pool
With the ice outDrops off or stops, because the cold surface is goneCarries on whenever it rains
Quick testThe outdoor dew point is above the ceiling temperature measured over centre ice with a hand-held infrared thermometerA roof inspection or leak detection finds the entry point; see our leak detection guide
Usual fixAir-sealing the roof edges and penetrations, dehumidification, a low-emissivity ceiling, and a better roof assembly at the next re-roofRepair of the membrane, flashing or drain

The roof matters even when the water is condensation. Building Science Corporation found that outdoor air leaks into the roof assembly "primarily at the eave, and gables, but sometimes through lap seams in the roofing, at penetrations", and that in summer the stack effect draws air in at the roof.

That is why a dehumidifier alone may not stop the drips: "Regardless of how dry the air in the arena, condensation will continue to occur." Its advice is to seal the gables, eaves and major penetrations before spending on mechanical changes. The National Research Council warned as early as 1962 that metal fasteners through a cold ceiling can drip "even when the remainder of the ceiling is completely dry", and that light fixtures leave holes in the vapour barrier.

At the next re-roof, the designer can fix the assembly itself: air-sealed edges, insulation that covers the steel, and vapour control on the right side. In an arena that is a real design question, because the ice makes the inside the cold side for part of the year.

CRCA's manual says "a higher quality vapour retarder may be required" in high-humidity buildings such as hockey arenas, while Building Science Corporation warns that vapour-tight linings inside the insulation "should not be used in ice arenas that are expected to operate during warm weather". Ask the designer to check the assembly for both winter and summer ice. Our guides cover vapour retarders on new roofs and condensation in humid plants.

How much snow can an arena roof carry?

As much as its structure was designed for, and an arena's long clear span over the ice leaves no columns to share the load. Ontario's Building Code designs a roof for a share of the local ground snow load, and several of its rules bear on arena and recreation centre roofs more than on a small commercial roof in the same town.

Building Code rules that matter on arena and recreation centre roofs. Source: 2024 Building Code Compendium, January 16, 2025 edition, Divisions A and B. Ontario has amended the code since that edition, so confirm with your engineer.
RuleWhat it saysWhat it means for the roof
Occupancy (Table 3.1.2.1)Arenas, rinks and indoor pools are Group A, Division 3, "assembly occupancies of the arena type"; halls and gyms are Group A, Division 2A recreation centre usually holds both, and each part follows its own rules
Importance (Table 4.1.2.1)"Community centres and elementary, middle and secondary schools are High Importance Category buildings"The structure is designed for 15% more snow and wind than a normal building (importance factor 1.15 instead of 1.0)
Large roofs (4.1.6.2)The basic roof snow load factor is 0.8 until the roof's characteristic length passes 70 m, then climbs toward 1.0The wind clears less snow off a very large roof, so it is designed for more of the ground snow
Lower roofs (4.1.6.5)A roof next to a higher roof carries a drift, heaviest at the wallLobbies, dressing rooms and plant rooms against the tall arena wall collect the extra snow
Fire rating (3.2.2.17)The roof's fire-resistance rating may be waived for arenas and rinks if the roof "carries no loads other than normal roof loads" and is at least 6 m above the floorAsk the designer before adding heavy new loads such as a solar array

The Code does not name arenas in its importance table, so whether a stand-alone arena counts as a community centre is for the structural engineer and the municipality to settle. The large-roof rule is simple arithmetic. For a roof 80 m by 100 m, the characteristic length (2w minus w squared over l) is 96 m, and the factor rises from 0.80 to about 0.85, or roughly 6% more design snow. A 45 m by 75 m roof stays at 0.80.

A long low-slope industrial roof in Mississauga with a 2-ply modified bitumen system by OYH Roofing, rooftop units spread along it and parking on both sides
The 53,000 sq ft industrial roof in Mississauga where OYH Roofing installed a 2-ply modified bitumen system, with 20 years on labour and materials. On large roofs, the Building Code's snow factor depends on the roof's length and width, not only on the town's snow load.

A re-roof can change the numbers. Thicker insulation, an extra ply, ballast, pavers or solar panels all add dead load, and Part 11 of the Code says that after a repair "the performance level of the building may remain the same, or be made better, but may not be made worse". Where a roof assembly is substantially removed and rebuilt, the new structural elements must meet the current Code (11.3.3.2). In practice, both mean a structural engineer's review before an arena roof gets heavier. Our snow load guide shows where drifts form and how to clear a roof safely.

Ontario has reason to take this seriously. The Ontario Recreation Facilities Association's 2017 bulletin on snow load shows a photo captioned "Listowel Arena Collapse, 1959 Killing 8 People" and warns of "the lack of comprehensive professional structural engineer reviews" of the province's aging recreation buildings. It also ties leaks to the structure: "Buildings that are experiencing continual water penetration are at higher risk as rust may significantly contribute to the loss of structural integrity." A leak that has run for years over an arena is a question for an engineer as well as a roofer.

Elliot Lake learned this the hard way. The city closed its Centennial Arena, built in 1968, in September 2023 while engineers examined its wooden structure. The engineer told a city committee that the problems were mainly due to "significant [roof] leaking over a prolonged period", and that "critical elements in the trusses and columns had decayed". A 2024 report to council put the repairs at $4.3 million.

The Ministry of Labour's snow alert (updated September 15, 2026) tells owners to have roofs "assessed by a professional engineer" when snow is heavy or there are "visible signs of structural distress, for example, twisting, bending or cracking". Snow removal should follow an engineer's procedure that avoids "producing any uneven or concentrated loading on the roof", with fall protection for the crew and the drop zone below closed off. Shovels and snow blowers also cut membranes, so look the roof over once it is clear.

How does the ice plant affect work on an arena roof?

The refrigeration plant that makes the ice often reaches the roof: a condenser or fluid cooler on supports, relief vent pipes, and plant-room exhaust fans and intakes. Many arena plants run on ammonia. Ontario's rules for them are written for the plant owner and operator, not for the roofer, so the roof crew works through the operator.

  • Relief vent pipes. TSSA's guide to relief piping (SB12-01, 2012) says discharge piping must be directed "away from people, structures or items including running boards, platforms, ladders or other areas used by personnel" and from "air intakes for ventilation", and that lines vented outside must be "protected from freezing and ingress of water or foreign material". On the roof, that means no capping, covering, bending or moving a relief pipe, no materials stored beside it, and any change to the piping left to the refrigeration contractor.
  • The operator's emergency procedures. The Operating Engineers regulation (O. Reg. 219/01, s. 46) requires the plant owner to keep an operating manual covering "all emergency procedures". Before work starts, get the ammonia alarm signal, the way off the roof and the operator's phone number. Plant-room visits go through the operator; TSSA's 2023 ice plant advisory says the logbook records "the entry of any unauthorized person to the plant".
  • The ice-out season. The plant does not stop being a hazard when the ice comes out. The same advisory tells owners that an unattended plant must remain safe "during holidays and extended periods of closure".
  • Curbs and supports. Condenser stands, pipe supports and penetrations are flashed like any rooftop equipment, but lifting or disconnecting refrigeration equipment is the refrigeration contractor's job.

The care is earned. On October 17, 2017, three workers died at the Fernie Memorial Arena in British Columbia "while performing maintenance on ice-making equipment", and 95 residents from 55 nearby homes were evacuated. The failure was inside the plant, not on the roof, but it showed how far an ammonia release can reach.

What happens to solar panels when an arena roof needs work?

They usually have to come off, and that can be one of the biggest costs of the job. Ontario municipalities have put solar panels on arena and community centre roofs since about 2010, many under the provincial FIT program. Toronto's 2015 staff report on its program with Toronto Hydro describes solar installations "on the roofs of City-owned buildings" selling power under FIT contracts, with revenue counted over 20 years and a 25-year panel warranty. The roof under the panels may not last that long.

Brockville's Memorial Centre, built in 1981, shows what can go wrong. Its 2024 roof assessment found that leaks had "been reported on this roof for close to a decade" since solar panels went on, because "the panel mounting brackets were simply fastened through a through fastened metal system leaving a large quantity of holes in the roof throughout". With panels over most of the roof, repairs could not be done without removing them. The city estimated about $250,000 to decommission and remove the panels, inside a $1.66 million estimate to replace the main metal roof, and the panels came off in November 2025.

  • Before panels go on: replace or restore the roof first if it has less life left than the panels, and have the roofer flash every mount. A rooftop solar collector of 5 m² or more counts as a building under the Building Code, so it needs a permit.
  • When the roof is due: put panel removal, storage and reinstallation in the roof budget, and ask the solar owner or contractor how long the system can be off.
  • In both cases: ask a structural engineer whether the roof can carry the panels, ballast and any new insulation together.

When is the best time to repair or replace an arena roof?

When the ice is out, if the roof can wait. Over the ice, a crew is working above the most expensive floor in the building, and drips or debris land straight on the ice. Many Ontario arenas take the ice out, or run fewer rinks, for part of the spring and summer, and recent projects show how owners plan around it.

Three recent Ontario arena roof projects. Sources: City of Brockville, Staff Report 2024-155 (September 17, 2024) and Memorial Centre Roof Renovation project page; City of Brampton, RFP2025-258; AM800 CKLW, June 2, 2026.
ArenaRoof and problemHow the work was timed
Memorial Centre, BrockvilleFlat built-up roofs and a pre-engineered metal roof from 1981; years of leaks around through-fastened solar brackets, wet insulation, leaks "above the rinks surface"Planned to start "as soon as ice is removed in April of 2025"; the building actually closed March 16, 2026, and the ice pad went back in on August 29, 2026
CAA Centre, BramptonBuilt-up roofs over three rinks, about 92,700 sq ft, "over 27 years old", with "interior water damage and mould"Design-build contract awarded October 1, 2025, for phase 1, with work to be "completed by December 2025"
WFCU Centre, WindsorRoof over one of three community rinks replaced after an April 2025 fire; low-emissivity ceiling and insulation checked; solar panels to be reinstalledThe city usually runs two of its three community rinks in summer, and plans further roof work for the rink that is shut, one summer at a time

Brockville's project started almost a year later than planned and closed the building for about five and a half months, so start the design and tender early: a roof replacement for the ice-out season is best tendered by winter. Recreation centres with a pool, gym or hall under other roofs can stay open if the work is phased by roof area. While the crew works, plan for:

  • The ice, boards and seats. Where deck or insulation is opened over a rink with ice in, protection and a daily watertight close-up matter more than speed.
  • Air intakes. Dehumidifiers and make-up air units on the roof draw in asphalt and adhesive odours; shut them down or move the work, as on any occupied building.
  • Fire rules. The Fire Code's fire safety plan rules apply to every building with "an assembly occupancy", and the plan must be revised before work "including hot surface applications" starts (2.8.1.1 and 2.8.2.1.(5)). Exits stay "free of obstructions", and fire routes stay clear of bins, cranes and material (2.7.1.7 and 2.5.1.2).
  • Leaks during the season. Brockville's arena had "250 feet of preventative eavestrough concealed above the insulation" to catch water over the ice. A temporary repair that holds until the ice is out is often the right call.

Is there funding for arena roof repairs in 2026?

Yes, for municipalities and non-profits, but the timing rules matter as much as the money.

Funding that can cover arena and recreation centre roofs, as of November 2026. Sources: Ontario, CSRIF Stream 1 Program Guidelines 2026-2029; Housing, Infrastructure and Communities Canada program pages.
ProgramWhat it coversPoints to watch
Ontario Community Sport and Recreation Infrastructure Fund, Stream 1 (repair and rehabilitation)$100,000 to $1 million per project; eligible examples include "repairing roofs, structural defects, building hazards"; up to 50% of eligible costs for municipalities, local services boards and non-profits, up to 90% for Indigenous applicantsIntake closes December 22, 2026, at 4:00 p.m. ET. Costs incurred before the minister's approval letter, routine maintenance, taxes and unitemized contingencies are not eligible. Work must finish by March 31, 2029
Build Communities Strong Fund, Community stream (formerly the Canada Community-Building Fund)Formula money that municipalities spend across 19 categories, including "sport" and "recreation"Not an application; councils decide. AMO administers it for every Ontario municipality except Toronto
Green and Inclusive Community Buildings (federal)Energy and resilience retrofits of community buildingsThe application period is closed; the program runs to March 2029 for projects already approved

The CSRIF rule on early costs is the one that catches owners: a roof started before the approval letter loses its funding. Soft costs such as design and assessments are eligible but capped at 20% of the grant. Brockville's Memorial Centre roof was supported by $978,000 from the Ministry of Sport. For how public owners tender the work and what goes into the budget, see our guides to public roofing tenders and budgeting for a roof replacement.

Has OYH Roofing worked on municipal buildings?

Yes. OYH Roofing installed an 8,500 sq ft IKO 2-ply modified bitumen roof on the City of Mississauga building at 3185 Mavis Rd, a full-system installation with a 20-year system warranty. It is the roof in the photo at the top of this page. We have not published an arena project, so this guide relies on the Building Code, public tenders and the manufacturers' and researchers' guidance cited below.

OYH Roofing is an Oakville-based industrial, commercial and institutional flat roofing contractor working across the GTA. On an arena or recreation centre, we can find and repair leaks over the ice and the pool, tell a leak from condensation, re-flash rooftop equipment with the refrigeration contractor's input, and plan a replacement around the ice-out season. For how public owners tender the work, see our municipal and institutional roofing guide, and see all our completed projects.

Frequently asked questions

What can cause a roof collapse?

On arenas and other long-span roofs, usually heavy snow, made worse by rain soaking into it and by drifts against higher walls. Ontario's Ministry of Labour notes that "Rain falling on accumulated snow will add even more weight." The other cause is a weakened structure: steel rusted or wood rotted by years of leaks, as at Elliot Lake's arena. Bending, twisting or cracking in the structure calls for a structural engineer right away.

How to stop condensation dripping from a roof?

Over an ice rink, first confirm it is not a leak, then lower the dew point of the air and keep the ceiling warmer than it. Building Science Corporation advises air-sealing the eaves, gables and penetrations before changing the mechanical system, and a low-emissivity ceiling keeps the ice from chilling the roof. Arena refrigeration contractor CIMCO says dehumidifiers for a typical recreational arena are sized for about a 35°F (2°C) dew point. Fix the roof assembly at the next re-roof.

Can you replace just a section of a roof?

Yes, and on arenas it is common, because most have several roof areas of different ages and systems. Brockville priced its flat roof sections separately from the metal roof over the rink, and Brampton awarded the first phase of its CAA Centre roof replacement in 2025. The new section must tie into the old roof with proper edge details so water cannot run between them, and its warranty covers only the new work.

When is the best time to replace an arena roof?

While the ice is out, usually late spring and summer, with the design and tender finished over the winter before. Work over a rink with ice in is possible but slower, because the ice, boards and seats need protection and every section must be closed watertight each day. In a recreation centre, phase the work by roof area so the pool, gym and halls can stay open.

Does an arena roof replacement need a building permit?

Often, yes. Ontario's Building Code Act requires a permit to "construct", which includes "material alteration or repair", and the Building Code has no general exemption for re-roofing. Many building departments do not ask for one when only the roof covering is replaced like for like, but deck or structural work, drainage changes, added weight and solar arrays of 5 m² or more need one. Check with the local building department before tendering.

Drips on the ice, a leak over the bleachers, or a roof to replace before the next ice season?

Send us photos of the drips and the roof, the roof drawings if you have them, and the dates the ice comes out, and we will tell you whether it is the roof and plan the work around your schedule.

Call 1-833-775-7663Request an assessment
Karol Rajkowski, Vice President of OYH Roofing

Karol Rajkowski

Vice President · OYH Roofing

Karol Rajkowski is Vice President of OYH Roofing, an Oakville-based ICI flat-roofing contractor whose projects include the 8,500 sq ft roof of a City of Mississauga building and the 53,000 sq ft roof of an industrial building in Mississauga. Learn more about the OYH team.

Sources

OYH Roofing, 2120 Speers Rd, Oakville, ON L6L 2X8 · 1-833-775-7663 · info@oyhroofing.ca