Short answer

Self-storage roofing covers two kinds of roof: flat membrane roofs on multi-storey climate-controlled buildings and metal roofs on single-storey drive-up units. Leaks hide behind locked doors, so inspect twice a year and after storms. Ontario's Building Code treats self-storage as a medium-hazard industrial building, and each unit may hold up to 50 L of fuels or solvents, so flame-free systems are the safer choice over rented units. A worn metal roof can often be covered with a membrane instead of torn off.

What makes self-storage roofing different?

Self-storage roofing is roofing over thousands of other people's belongings that nobody can see. Ontario's property assessor, MPAC, reported in 2023 that the province had "37.3 million square feet of commercial self-storage space", and that "Toronto now has more than eight million sq. ft." Mississauga had about 2.1 million and Burlington about 790,000. Four things set storage roofs apart:

  • Locked units. Almost all of the floor area is rented and closed, so a leak can run for weeks before a tenant finds it.
  • Unknown contents. Ontario's Building Code classes a self-service storage building as a Group F, Division 2 (medium-hazard industrial) occupancy, and the Fire Code lets every unit hold up to 50 L of flammable and combustible liquids.
  • Two very different buildings. New GTA facilities are mostly multi-storey and climate-controlled with flat membrane roofs, while older sites are rows of single-storey metal buildings.
  • Customers on site all day. Many facilities offer long or 24-hour access, so roof work happens around moving trucks, gates and people carrying boxes.

Which roofs do self-storage buildings have?

It depends on the building type, and many facilities have more than one. MPAC notes that "the traditional low-rise, mini-warehouse structure is still common" but that newer facilities are "typically larger, fully enclosed, multi-storey structures". In Toronto, a 2026 planning report approved a 4-storey storage building on a site "currently occupied by a one-storey self-storage building".

Self-storage building types and their roofs. Sources: MPAC (2023); Johns Manville, The Right Roof for Self-Storage Facilities; Self Storage Association (U.S.), May 26, 2021; Building Code, January 16, 2025 edition, Section 3.10.
BuildingUsual roofCommon problemsUsual fix
Multi-storey climate-controlledTPO, EPDM or modified bitumen over steel deck and insulation, with rooftop HVAC unitsLeaks at HVAC curbs, drains and parapets; wet insulation; dripping in hallwaysMembrane repair or replacement, like any commercial flat roof
Single-storey drive-up rowsMetal panels on purlins, often with a thin vinyl-faced blanket underneathFasteners backing out, worn seam sealant, condensation, clogged gutters over the doorsMetal repair, a coating, or a membrane re-cover over the metal
Converted warehouse or industrial buildingWhatever the old building had: built-up, modified bitumen or single-plyAn aging roof inherited with the building, often never surveyedRoof survey before the conversion, then repair or replace

Johns Manville says "Climate control and inner-city landscape resulted in the need for multi-level temperature-controlled buildings", and it offers TPO, EPDM and SBS modified bitumen for them. The Self Storage Association in the U.S. states that "Most storage facilities have metal roofs", which matches the older drive-up sites in Ontario. New buildings also bring new roof uses: Apple Self Storage's Guelph facility, certified Zero Carbon Building-Design in December 2025, has "A 185 kW rooftop solar installation", and new storage buildings in Toronto must meet Tier 1 of the Toronto Green Standard.

The Building Code has its own section for these buildings (Section 3.10), and even small ones must follow it. Two parts touch the roof. A firewall in an F2 building needs a 4 h rating and must rise at least 900 mm above the roof as a parapet, unless the roofs step more than 3 m or the wall ends under a rated concrete slab (3.1.10.2 and 3.1.10.4). And single-storey storage buildings in a group must be at least 6 m apart (3.10.4.3), close enough for snow to drift between them; our snow load guide shows where drifts form.

How do you find leaks in a storage building?

By looking for them on a schedule, because tenants will not report them in time. Modern Storage Media, a U.S. trade magazine, put it plainly: owners "often won't know a roof has failed until a disgruntled tenant shows up at the office with the news that a leak has damaged the customer's contents", because most of the space is "behind the tenants' closed roll-up doors". It recommends "Semi-annual inspections and maintenance", with extra checks "especially following a major storm".

  • Inspect the roof twice a year, usually spring and fall, and keep the records: membrane warranties often require documented maintenance. Our maintenance checklist covers what to look at.
  • Check vacant units and hallways after heavy rain. They are the only part of the inside you can see, and stains under HVAC ducts, skylights and roof hatches point to the leak above.
  • Keep gutters and drains clear. Modern Storage Media notes that "A common cause of leaks and corrosion is clogged gutters", and on drive-up buildings an overflowing gutter sends water under the eave and into the units.
  • Act on the first tenant report. Photograph the stain, mark the unit on a roof plan and call the roofer before the next rain. A wet unit usually means wet insulation that keeps dripping.

Finding the exact entry point may mean opening rented units. Read your rental agreement before you need it: one Ontario operator's agreement lets it "remove Your lock and enter the Unit to examine its contents, make repairs" if the tenant does not give access. Tell tenants before a unit is opened, and have two staff present. Our leak detection guide explains the methods a roofer uses to trace water under a membrane.

On metal drive-up buildings, check whether the water is a leak at all. Metal panels are poor insulators, so warm, humid air inside a unit condenses on the cold underside of the roof and drips onto the contents. The Reflective Insulation Manufacturers Association says "Maintaining a reasonable inside relative humidity (less than 60%) is an important factor in preventing condensation", and that "A vapor retarder is highly recommended on the underside of metal roof decks." Drips that come on cold, clear nights rather than during rain, or that start where the insulation facer is torn, point to condensation. Our arena roofing guide covers the same question over ice.

Can an old metal storage roof be covered instead of replaced?

Often, yes, and on a storage building that is usually the main reason to choose it: the old roof stays in place as a lid over the units while the new one goes on. Modern Storage Media notes that owners worry about "tearing off a roof above rental units and potentially exposing their contents to the elements". There are two flat-roofing options.

Options for a worn metal roof on a self-storage building. Sources: GenFlex, EZ TPO Metal Building Retrofit Guide (April 2026); IKO project profile, Abbott Tool & Die (2025); Self Storage Association (U.S.), May 26, 2021.
OptionHow it is builtPoints to watch
Membrane re-coverInsulation cut to fill the flutes between the ribs, then insulation or a cover board, then a TPO, PVC or EPDM membrane, adhered or fastened into the purlinsFastener pull-out tests on the purlins and panels, wind uplift testing, and a structural check for the added weight. Adds insulation, which helps with condensation
CoatingSeams and fasteners sealed, then a silicone or acrylic coating over the whole roofOnly for panels that are still sound. Adds no insulation; see our roof coating guide

The GenFlex guide spells out the details: "Flute fill shall be installed between the metal panel ribs and be of a minimum height to match the height of the ribs", and "Pullout test results must be submitted to GenFlex prior to project start and approval."

The same guide warns that "Existing roof components, failure related to existing panels or structure are not included in the Roofing System Limited Warranty", and that "The building owner or the building owner's designer are responsible for validating the building structure can support the proposed installed roofing system." In Ontario, the membrane assembly's wind uplift resistance has to be shown by CSA A123.21 testing, which covers only the fastener or adhesive patterns tested (Building Code 5.2.2.2.(4) and Note A-5.2.2.2.(4)).

How fast can it go? IKO's profile of an 80,000 sq ft metal building re-cover in Missouri (flute fill, fastened polyiso, cover board and adhered 80 mil TPO) ran from June 11 to June 26, 2024, and the owner chose it partly because "there was no trash tear-off to add to a landfill". That job was not a storage building, but the same build-up suits a drive-up row. A coating is the lighter option, but as the Self Storage Association notes, coatings "don't provide any additional R-value". Repairs to the metal panels themselves are work for a metal roofing contractor; the membrane and coating options are flat-roofing work.

Is torch-on roofing safe over storage units?

It can be done under the Fire Code's rules, but over rented units full of unknown goods, flame-free systems are usually the better choice. The Fire Code allows each unit to hold "Not more than 50 L of flammable liquids and combustible liquids, of which not more than 30 L shall be Class I liquids" (4.2.12.2), and the roofer cannot see what is under the deck.

  • Protect what is near the torch. Combustibles within 5 m of a hot surface application must be protected, and roof openings within 5 m covered or closed (5.11.2.1).
  • The firewatch covers the units below. It must include "any area where combustibles on the underside of roofs or the opposite side of walls might be ignited" (5.11.2.5.(1)(c)). In a storage building that means rented units, which may need to be opened. Our industrial roofing guide covers how long the firewatch must last.
  • Cutting and grinding count too. Cutting steel deck or metal panels throws sparks; combustibles must be "kept at least 15 m from the work area" or shielded with noncombustible material (5.17.3.1).
  • Fire safety plans. Buildings of 4 storeys or more need a fire safety plan, and it must be revised before work "including hot surface applications" starts (2.8.1.1 and 2.8.2.1.(5)).

Adhered or heat-welded single-ply membranes, and self-adhered or cold-applied modified bitumen, avoid open flame over the units. Hot-air welding of TPO and PVC seams is still heat work, but it does not put a flame on the deck. Choose the system with the owner's insurer before the tender.

What does Ontario require for roof access on storage buildings?

Less than most owners expect for the building, and more for the crew. The Building Code sets out roof access mainly for taller buildings, while the Construction Projects regulation protects anyone working on the roof.

Roof access and fall protection rules that apply to self-storage roofs. Sources: Building Code, January 16, 2025 edition, Division B; O. Reg. 213/91 (Construction Projects), consolidation from April 20, 2026.
RuleWhat it says
Building Code 3.2.5.3.(1)Buildings more than 3 storeys with roofs flatter than 1 in 4 need access from the floor below by a stairway or "a hatch not less than 550 mm by 900 mm with a fixed ladder"
Building Code 3.10.4.5Single-storey self-storage buildings without a basement or mezzanine are exempt from most of the firefighting rules in 3.2.5, including that roof access rule, but need fire access routes at least 9 m wide
Building Code 3.3.1.18.(1)(a)A guard at least 1 070 mm high is required "around each roof to which access is provided for other than maintenance"
Building Code 3.3.1.3.(10)People servicing rooftop equipment may use stairways or fixed ladders as their way off the roof
O. Reg. 213/91, ss. 26 and 26.1Fall protection when a worker could fall more than 3 m or through an opening; a guardrail first, then travel restraint, fall restricting, fall arrest or a net
O. Reg. 213/91, s. 207On a built-up roof being built, repaired or resurfaced, a barrier at least 2 m from the roof edge, with a chain or rope 1.1 m high
O. Reg. 213/91, s. 82A portable ladder used for access must extend at least 900 mm above the landing

Two points matter on drive-up rows. Their eaves may sit close to the 3 m trigger, but the rule on falling through an opening applies at any height, and skylights and rusted-through panels are openings. And a roof used only for maintenance needs no permanent edge guard under the Building Code, so the crew's fall protection has to be brought and set up for each job.

How do you keep a self-storage facility open during roof work?

By working in sections and planning around the customers, not just the roof. A full tear-off over occupied units is the hardest case: the roofer has to close every section watertight each day, and opened units need security as well as weather protection. That is why re-covers and phased replacements are common on storage buildings.

  • Notices. Tell tenants which buildings or floors are affected, the dates, and a contact person. Post reminders the day before work starts.
  • Aisles and gates. Keep drive aisles open for customers and the fire department; on drive-up sites the Building Code's fire access routes are at least 9 m wide. Keep bins, hoists and material off fire routes and away from fire department connections (Fire Code 2.5.1.2).
  • Access and security. Agree how the crew enters the site, which gate code or escort it uses, and where the hoist goes, so the operator's cameras and alarms are not defeated.
  • Odour and noise. Climate-controlled buildings draw air through rooftop units, so schedule adhesive or asphalt work for quiet hours and shut down the units nearby if needed.
  • The units under the work. Before deck or insulation is opened over a unit, check whether it is rented and what is inside, and have tarps ready.

Who pays when a roof leak damages stored goods?

Usually the tenant's insurer, under the rental agreement, but the operator still has to fix the roof. A July 2020 rental agreement from an Ontario operator in Woodstock shows how these contracts handle it. It states "ALL PROPERTY IS STORED BY YOU AT YOUR SOLE RISK", requires the tenant to insure the contents, and excludes the operator's liability for damage from "WATER, RAIN, SNOW", even where the operator is negligent.

An Ontario court upheld a similar clause in 2024. In 2693693 Ontario Inc. v. Palmieri, 2024 ONSC 1881, a tenant leased "a storage unit located at 95 Joymar Dr., unit 7, Mississauga". The landlord's agent "retained Master's to repair the roof", and "A fire ensued shortly in the rented premises after the repair work". The court found the lease's exclusion clause valid and dismissed the claim against the landlord, its agent and the roofing contractor. That was a commercial lease, not a household storage locker, and Ontario's Consumer Protection Act, 2002 may give household tenants more protection; whether it covers storage rentals is not settled. Ask a lawyer about your own agreement.

For the operator, the practical answer is to keep the roof dry and the paperwork complete: inspection reports, repair invoices and photos show that a known leak was dealt with. For the roofer, the operator is the client, and the rental agreement sets what can be done inside a unit.

Has OYH Roofing worked on buildings like these?

We have not published a self-storage project, so this guide relies on the Building Code, the Fire Code and the sources below. Our closest projects are large single-storey industrial roofs with roll-up doors and occupied space below: the 53,000 sq ft industrial building in Mississauga (2-ply modified bitumen, 20 years on labour and materials) and the 50,000 sq ft TPO roof on the Millomat Stampings building, also in Mississauga. The photo at the top of this page shows a new single-storey building with its white single-ply roof going on.

White TPO roof on the Millomat Stampings building in Mississauga, with loading docks and a yard below
The 50,000 sq ft TPO roof on the Millomat Stampings building in Mississauga, installed by OYH Roofing with a 20-year labour and materials warranty. Climate-controlled storage buildings use the same single-ply membranes.

OYH Roofing is an Oakville-based industrial, commercial and institutional flat roofing contractor working across the GTA. On a storage facility, we can inspect and repair membrane roofs on climate-controlled buildings, trace leaks with as few units opened as possible, re-cover worn metal roofs with a membrane, and phase a replacement around your customers. See all our completed projects.

Frequently asked questions

What are the Ontario building code requirements for roof access?

For buildings more than 3 storeys with roofs flatter than 1 in 4, the Building Code requires access to the main roof from the floor below by a stairway or a hatch at least 550 mm by 900 mm with a fixed ladder (3.2.5.3). Single-storey self-storage buildings are exempt from that rule. Edge guards of at least 1 070 mm are needed only where the roof is used for more than maintenance; crews still need fall protection.

What happens if your stuff gets ruined in a storage unit?

Report it to the operator in writing with photos, and claim on your contents or tenant insurance. Storage agreements usually put the risk on the tenant, require insurance and exclude the operator's liability for water damage, and an Ontario court upheld a similar clause in a commercial lease in 2024. Household tenants may have rights under the Consumer Protection Act, 2002; a lawyer can tell you whether it applies.

What happens if a roof leak is left untreated?

The insulation under the membrane soaks up water and keeps dripping after the rain stops, steel decks and purlins rust, and mould grows on stored goods and drywall. In a storage building it also means damaged customer property and claims. A wet roof that could have been patched may end up needing a tear-off, because a new roof should not go over wet insulation.

How often should a self-storage roof be inspected?

Twice a year, usually in spring and fall, and after every major storm. Check the roof surface, seams, curbs, drains and gutters, and walk the vacant units and hallways for stains. Keep dated reports and photos; membrane warranties often require documented maintenance, and the records help if a tenant later claims for water damage.

Can you put a new roof over an old metal roof?

Often, yes. Insulation is cut to fill the flutes between the ribs, a board goes on top, and a TPO, PVC or EPDM membrane is adhered or fastened into the purlins. The metal must be sound enough to hold fasteners, the structure must carry the added weight, and the assembly needs wind uplift testing. The old roof stays in place, so the units below stay covered during the work.

Water in a storage unit, or a metal roof that has had its last patch?

Send us photos of the stains and the roof, a site plan with the buildings marked, and your busiest days, and we will plan the inspection or the work around your customers.

Call 1-833-775-7663Request an assessment
Karol Rajkowski, Vice President of OYH Roofing

Karol Rajkowski

Vice President · OYH Roofing

Karol Rajkowski is Vice President of OYH Roofing, an Oakville-based ICI flat-roofing contractor whose projects include the 53,000 sq ft roof of an industrial building in Mississauga, the 50,000 sq ft TPO roof at Millomat Stampings and the 52,300 sq ft roof at 777 Niagara St in Welland. Learn more about the OYH team.